Solicitar presupuesto
Solicitar presupuesto

Sistema de fermentación

Sistema de fermentación

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL Fermenter

20HL fermenter is manufactured by ZR BREW,we can customize beer fermentation tanks of different specifications according to customer needs. All fermentation tanks are made of certified 304 or 316 stainless steel materials and components, 100% TIG welding and hygienic polishing,to ensure food hygiene level, and strictly undergo strict production process Quality control, inspectionp; and pressure testing, form detailed inspection records, and send out with the goods. ZR BREW guarantees free delivery of all valves and fittings.


Product Paramenters




InteriorJacket
MaterialSUS304SUS304
Working pressure (Mpa)0.2 (30psi)0.2(30psi)
Design pressure (Mpa)0.3 (45psi)0.4 (60psi)
Effective volume20HL
Total volume25HL
Tank Size (mm)Ø1600*3100
Cooling methGlycol water cooling
Insulation materialPolyurethane
Insulation thickness(mm)80
Inter tank thickness (mm)3.0
Outer tank thickness(mm)2.0
Cone angle60°
Note:1Barrel (BBL) =117 Liter   1Hl=100 Liter  1Gallon=3.7854 Liter  145psi=1MPa

Details Images


20HL Fermenter                                                                                 

20HL Fermenter20HL Fermenter20HL Fermenter1000L Fermentation tank
Mechanical PRV Sample ValvePressure manhole   Racking Arm    
1000L Fermentation tank1000L Fermentation tank1000L Fermentation tank1000L Fermentation tank
   Titanium Rods    Temperature Sensor Solenoid valveWelding Detail   


20HL fermenter  standard configuration


Dished and conical head are available

 Pressure side manhole door

 TC connected CIP arm with 360° coverage spraying ball

 Sanitary sample valve

 Mechanical safe valve PVRV 2 bar on top

 Diaphragm pressure gauge on CIP arm

 Horizontal rotating racking arm and port on cone with butterfly valve

 Tri clamp discharge arm with butterfly valve

 Dry hopping port 4-6'' TC with solid end cap

 Thermowell for high accuracy temperature sensor

 4pcs completely SUS304 heavy duty legs with leveling pad and legs support

 Complete valves, fittings and all parts

 100% TIG welding with pure argon gas shield

 Interior Finish: Sanitary 2B finish, Pickled and Passivated; (8K Mirror finish optional)

 Exterior Finish: Oil brushed finish(2B, 8K Mirror finish optional)

 Interior full polished to 0.2~0.4 μm without dead corner

 Glycol Jacket: Dimpled plate on cone and side


20HL fermenter  optional configuration


 Separate blow-off pipe & CIP

 Carbonation stone for CO2

 Display temperature gauge in front 

 Liquid level display on the sidewall


Advantage of configuration


 For easy yeast excretion, designed with a 60° cone angle

 Polishing/drawing/mirror finish/pickling passivation optional

 Shadowless manholes or top manholes depending on the customer's fermentation process and brewing type.

 The headspace is larger, and the covering headspace volume is calculated separately and additionally.

 Jacket test by water and gas, 5bar/75psi for 1hour, 3.5bar/52psi for 48 hours,Tank leakage test by water and gas, 4bar/60psi for 1hour,   2.5bar/37.5psi for 48 hours,all data will be recorded to facilitate strict quality control and management

 Easy to operate with dedicated ladder

 For easy lifting, it is equipped with lifting lugs.

 For flexible conveying of beer, it is equipped with a swivel rocker

 To ensure tank alignment and leveling, it is equipped with adjustment bolts                                                                           


Specifications and models



Sepcification selectionTotal volume(L)Cooling ares(m2)Diameter(mm)Height
ZR-FV-1001250.866501500
ZR-FV-2002501.38501600
ZR-FV-3003751.98602000
ZR-FV-4005002.19602000
ZR-FV-5006252.29602200
ZR-FV-100012503.412602600
ZR-FV-150018754.514602850
ZR-FV-200025005.416003100
ZR-FV-250031256.018003400
ZR-FV-300037506.718003600
ZR-FV-400050007.619004000
ZR-FV-500062508.522003800

1000L Fermentation tank







Our service



1000L Fermentation tank


Pre-sale service :     After- sale service:

1. Free turnkey beer brewing/filling/packaging solutions.      

1. Perfect packaging and transportation, all the tanks are wrapped by three layers of PE protective film, the nozzles are blocked by dust caps, the spare parts are sealed in wooden boxes, the whole loading process is recorded by photos, and accompanied by a checklist, sent to you together.

2. The technical team with 13 years of experience in the beer brewing equipment industry, one-to-one service, provides different brewing process according to your requirements.  

2. Complete installation and commissioning services, providing detailed installation instructions in English or French, online video-guided installation and offline door-to-door installation. You can choose between two installation and commissioning modes. We are also establishing technical service teams around the world, so that you can look back worry-free.

3. According to your site, carry out overall project planning and provide two-dimensional and three-dimensional layout drawings.

3. Lifetime warranty and technical consultation.

 

Project Case



10BBL Fermentation tank

10BBL Fermentation tank


1000L Fermentation tank






Why choose ZR BREW



46f89823d7476643df6a9529dbcb168.png

1000L Fermentation tank

Shandong Zeren Machinery Equipment Co., Ltd. referred to as ZR BREW.ZR BREW is an equipment manufacturer

focusing on the biological fermentation industry, mainly engaged in beer brewing equipment, providing high-end

comprehensive services of product design, production, processing, installation, technical process training. ZR BREW's

products have been exported to more than 40 countries and regions in the world. Mainly concentrated in Europe and

North and South America.

ZR BREW Company is located in Jinan City, and the factory is located in Dezhou City, covering an area of 10,000

square meters. The company has 52 employees, including 6 senior technicians and 8 intermediate technicians, with

more than 20 undergraduates. Project leaders and technical engineers have more than 13 years of work experience

in the beer industry.


Our factory



2000L Fermentation tank 

Our Team



2000L Fermentation tank


Certifications


1000L Fermentation tank

                                                                                                        
                                                         

1000L Fermentation tank



Cómo controlar la temperatura del fermentador

A:

El PLC o visualizador digital está conectado al sensor de temperatura PT100 instalado en el tanque a través de la línea de señal para controlar la temperatura.

¿Cómo usar tu fermentadora?

A:

ZR BREW tiene instrucciones en papel en inglés, y le enseñaremos hasta que lo haga bien.

¿Cuál es su plazo de pago?

A:

1. Transferencia T/T, pago por adelantado del 40% para iniciar la producción, después de pagar el pago del saldo del 60% para el envío. 2. Paypal o garantía comercial está disponible.

¿Cuál es el tiempo de entrega de su fermentador?

A:

Por lo general, el tiempo de entrega para el tanque del fermentador es de 30 días hábiles, mientras que el tiempo de entrega para el proyecto de cervecería completo es de 40 días hábiles, cronometrado a partir del dibujo final confirmado

¿Ofrecen servicio postventa?

A:

Sí, ZR BREW podría proporcionar un servicio posventa. Tenemos muchos ingenieros profesionales, pueden ir a su lugar y enseñarle a su persona a instalar y preparar cerveza.

ETIQUETAS beer brewing equipment/ Fermenter/ Fermentation tank/ fermenting equipment/ stainless steel beer equipment/ brewery craft/ brewery equipment/ conical fermenter/ micro brewery/ brewing machine

Shandong Zeren Machinery Equipment Co., Ltd. es un fabricante de equipos que se enfoca en la industria de la fermentación biológica.

Contacta con nosotras
  • >> Teléfono: +86 531 68659350
  • >> Correo electrónico: emma@zrbrew.com
  • >> WhatsApp: +86 131 8893 2181
  • >> Tel/WeChat: +86 131 8893 2181
  • >> Dirección de la oficina: habitación 413, edificio tong yuan, calle yingxiu, zona de alta tecnología, ciudad de Jinan, provincia de S shake
  • >> Dirección de fábrica: No.1 mid Linchang road, ciudad de LUN, ciudad de Y U, D Ezhou, provincia de S shake, P.R.China
Solicitar presupuesto

Copyright © Shandong Zeren Machinery Equipment Co., Ltd. Todos los derechos reservados | mapa del sitio | Apoyo técnico: