Details Images
![]() | ![]() | ![]() |
Mechanical PRV | Sample Valve | Pressure manhole |
![]() | ![]() | ![]() |
Titanium Rods | Temperature Sensor | Solenoid valve |
![]() | ![]() | ![]() |
Racking Arm | Ladder hook | Hop adding port |
![]() | ![]() | ![]() |
Welding Detail | Safety valve | Adjusting bolt |
10bbl beer fermenter standard configuration
Dished and conical head are available
Pressure side manhole door
TC connected CIP arm with 360° coverage spraying ball
Sanitary sample valve
Safety valve on top
Mechanical safe valve PVRV 2 bar on CIP arm
Diaphragm pressure gauge on CIP arm
Horizontal rotating racking arm and port on cone with butterfly valve
Tri clamp discharge arm with butterfly valve
Dry hopping port 6-8'' TC with solid end cap
Thermowell for high accuracy temperature sensor
Top hooks for hanging ladders
4pcs completely SUS304 heavy duty legs with leveling pad and legs support
Complete valves, fittings and all parts
100% TIG welding with pure argon gas shield
Interior Finish: Sanitary 2B finish, Pickled and Passivated; (8K Mirror finish optional)
Exterior Finish: Oil brushed finish(2B, 8K Mirror finish optional)
Interior full polished to 0.2~0.4 μm without dead corner
Glycol Jacket: Dimpled plate on cone and side
10bbL beer fermenter optional configuration
Separate blow-off pipe & CIP
Carbonation stone for CO2
Display temperature gauge in front
Liquid level display on the sidewall
Advantage of configuration
For easy yeast excretion, designed with a 60° cone angle
Polishing/drawing/mirror finish/pickling passivation optional
Shadowless manholes or top manholes depending on the customer's fermentation process and brewing type.
The headspace is larger, and the covering headspace volume is calculated separately and additionally.
Jacket test by water and gas, 5bar/75psi for 1hour, 3.5bar/52psi for 48 hours,Tank leakage test by water and gas, 4bar/60psi for 1hour, 2.5bar/37.5psi for 48 hours,all data will be recorded to facilitate strict quality control and management
Easy to operate with dedicated ladder
For easy lifting, it is equipped with lifting lugs.
For flexible conveying of beer, it is equipped with a swivel rocker
To ensure tank alignment and leveling, it is equipped with adjustment bolts
Specifications and models
Sepcification | Total volume(L) | Cooling ares(m2) | Diameter(mm) | Height |
ZR-FV-100 | 125 | 0.86 | 650 | 1500 |
ZR-FV-200 | 250 | 1.3 | 850 | 1600 |
ZR-FV-300 | 375 | 1.9 | 860 | 2000 |
ZR-FV-400 | 500 | 2.1 | 960 | 2000 |
ZR-FV-500 | 625 | 2.2 | 960 | 2200 |
ZR-FV-1000 | 1250 | 3.4 | 1260 | 2600 |
ZR-FV-1500 | 1875 | 4.5 | 1460 | 2850 |
ZR-FV-2000 | 2500 | 5.4 | 1600 | 3100 |
ZR-FV-2500 | 3125 | 6.0 | 1800 | 3400 |
ZR-FV-3000 | 3750 | 6.7 | 1800 | 3600 |
ZR-FV-4000 | 5000 | 7.6 | 1900 | 4000 |
ZR-FV-5000 | 6250 | 8.5 | 2200 | 3800 |
Cómo controlar la temperatura del fermentador
El PLC o visualizador digital está conectado al sensor de temperatura PT100 instalado en el tanque a través de la línea de señal para controlar la temperatura.
¿Cómo usar tu fermentadora?
ZR BREW tiene instrucciones en papel en inglés, y le enseñaremos hasta que lo haga bien.
¿Cuál es su plazo de pago?
1. Transferencia T/T, pago por adelantado del 40% para iniciar la producción, después de pagar el pago del saldo del 60% para el envío. 2. Paypal o garantía comercial está disponible.
¿Cuál es el tiempo de entrega de su fermentador?
Por lo general, el tiempo de entrega para el tanque del fermentador es de 30 días hábiles, mientras que el tiempo de entrega para el proyecto de cervecería completo es de 40 días hábiles, cronometrado a partir del dibujo final confirmado
¿Ofrecen servicio postventa?
Sí, ZR BREW podría proporcionar un servicio posventa. Tenemos muchos ingenieros profesionales, pueden ir a su lugar y enseñarle a su persona a instalar y preparar cerveza.
Shandong Zeren Machinery Equipment Co., Ltd. es un fabricante de equipos que se enfoca en la industria de la fermentación biológica.
Copyright © Shandong Zeren Machinery Equipment Co., Ltd. Todos los derechos reservados |
mapa del sitio
| Apoyo técnico: